Help
cancel
Showing results for 
Search instead for 
Did you mean: 
Ground Controller Lvl 2
Message 31 of 36

Re: Feature Request: Switch from ready to draft in pull requests

Bump, found this thread on Google! Have a PR that needs some work, would be nice to be able to mark it as "draft".

Mission Specialist Lvl 1
Message 32 of 36

Re: Feature Request: Switch from ready to draft in pull requests

+ 1 I am waiting for that feature too!

Ground Controller Lvl 2
Message 33 of 36

Re: Feature Request: Switch from ready to draft in pull requests

Came here after mistakenly clicking the "Mark as ready to review" button and frantically searching for a better solution aside from just closing and opening a new draft PR. Really hoping that this can be implemented at some point!

Ground Controller Lvl 1
Message 34 of 36

Re: Feature Request: Switch from ready to draft in pull requests

My team also had this problem as we had many WIP tags we wanted to convert to Draft PRs

Copilot Lvl 2
Message 35 of 36

Re: Feature Request: Switch from ready to draft in pull requests

I would really like to do this too. a few reasons
 - A PR is posted, but during the review some rework is needed. Currently this doesn't prevent merge. Moving back to draft would be one way to achieve this (another is more fleixble definition of approving reviews & enhancing of the overall lifecycle management)
 - When a bot such as dependabot creates a PR proposal, but we want to put on hold for a few weeks - moving to draft would prevent an accidental merge
 - Accidental creation of a PR in non-draft status - saves creating a new one!

Ground Controller Lvl 2
Message 36 of 36

Re: Feature Request: Switch from ready to draft in pull requests

+1

 

This would be much more convenient!